Supporting Development in Takeley, Essex

2024 Development with improved traffic simulation created with MOVA

Cannon were commissioned by Endurance Estates to be part of a team supporting development proposals in Takeley, Essex. Endurance take public consultation very seriously and have produced a promotional video which can be found at endurance-estates.co.uk

Cannon staff Rob Evans, Jessica Pratt and Dean Smy were camera shy but pleased to assist.

The development has considered existing congestion at a crossroads in the centre of village as part of a comprehensive assessment. Cannon made use of the VISSIM software package with PC-MOVA to simulate an improved traffic signal control system at the junction that significantly reduces delay. Some of the video output is shown below, before and after the MOVA system is implemented.

2018 Existing traffic simulation

2024 Do Nothing traffic simulation